2008/07/10
Having decided to replace a water tank used in the tar separation process for coke production, ArcelorMittal chose the West Industry division to change the unit's pipes.
As a result, SPIE Belgium is taking charge of supplying and installing the pipes, along with painting, routing and insulation.
The first phase is being conducted in Aalter, in the province of East Flanders, in Belgium Flemish region, where prefabricated components are being assembled in the workshop.
Installation on site is scheduled for the months of September and October.
This contract is worth €537,000.
Contact
SPIE SA
Pascal Omnès
Communications director
Tel.: +33 (0)1 34 22 58 21
e-mail : pascal.omnes@spie.com