2008/09/04
The Alsace commercial sector office of SPIE Est is taking complete charge of the installation of 225 sq. m. of integrated solar collectors on the structural steelwork of a storage hall operated by Eschlimann* in Haut-Rhin, France.
The installation, connected to the ES power grid (EDF), will generate 28 kWc.
This €177,000 contract is for the design, engineering and installation of a photovoltaic solar generator and includes:
The work is to be performed between August and September 2008.
* Company specialising in heritage preservation and restoration.
Contact
SPIE SA
Pascal Omnès
Communications director
Tel.: +33 (0)1 34 22 58 21
e-mail: pascal.omnes@spie.com