Share

Major projects

  • Envoyer cette page par courriel.
  • Afficher la version PDF de cette page (nouvelle fenêtre).
  • Agrandir la taille du texte.Reinitialiser la taille du texte.Réduire la taille du texte.
25/06/2013
The Netherlands

CO2 Catch-up project

N.V. Nuon Energy commissioned SPIE Nederland B.V. for assistance in developing a CO2 capture pilot plant based on pre-combustion technology. 

At the plant, CO2 is captured from the synthesis gas flow originating from the Nuon coal and bio mass gasification process. With the CO2 Catch-up project, Nuon aims to demonstrate pre-combustion CO2 capture on a large scale at its Eemshaven-based Nuon Magnum plant in the North of the Netherlands. Uniting a multi-disciplinary team, SPIE-Controlec Engineering and SPIE-Industry executed the project as part of a contract that includes engineering, procurement and construction. The trial period is expected to take two years, with a total € 40 million investment.

Services provided

  • Engineering (SPIE-Controlec Engineering)
  • Project management (SPIE-Controlec Engineering)
  • Construction and installation (SPIE-Industry)

contact

Willem van der Graaf
Director Sales & Business Development

Tél. : +31 (0)765445444