Share

Major projects

  • Envoyer cette page par courriel.
  • Afficher la version PDF de cette page (nouvelle fenêtre).
  • Agrandir la taille du texte.Reinitialiser la taille du texte.Réduire la taille du texte.
24/06/2012
Germany

IT infrastructure installation for the TOTAL tower

SPIE Deutschland System Integration installed the IT and telecommunication infrastructure for the new tower housing TOTAL’s German subsidiary in Berlin.

The TOTAL Group’s new head office in Berlin is located in a 17-storey tower rising to a height of 69 m. This is the first building erected in Europacity, the new neighbourhood that blends commercial and residential buildings near Berlin’s new central rail station.
For the new tower, SPIE Deutschland System Integration built a modern, high-performance and high-security IT infrastructure. SPIE Deutschland System Integration also installed 600 terminals equipped with Unified Computing System (UCS) technology, as well as a VSS-Core and a vast Wi-Fi infrastructure. Construction spanned 18 months and was completed within the projected deadlines.
 

key figures
14 000 m2
commercial space
18 months
project duration
€1.1 million

 

contact

Dan Fischer
Berlin Agency Manager

e-mail: d.fischer@spie.com