Bad Lauchstädt Energy Park

Parc énergétique de Bad Lauchstädt

EQUIPPING A HYDROGEN-READY ENERGY HUB

Fact sheet

  • Services: M&E
  • Subsidiary: SPIE Germany Switzerland Austria
  • Year: 2025
  • Tags: Energy_Transition, Hydrogen
  • Status: Completed

SPIE’s hydrogen-based energy supply system enabled carbon-neutral heat treatment for BILSTEIN GROUP’s pioneering cold steel strip production plant in Hagen, Germany.

BILSTEIN GROUP, a world leader in cold strip manufacturing, aims to replace natural gas with hydrogen in the energy-intensive processes needed to produce cold-rolled steel strip. The strip must be heated to 500-800°C until it becomes ductile enough for downstream processing (e.g., for automotive applications). Switching from natural gas to hydrogen is extremely challenging, because to achieve equivalent performance, hydrogen must be supplied in much greater quantities. 

SPIE installed an onsite hydrogen supply system for an entire heating mantle with 11 burners—a total heat output of 1,800 kW—with no loss of performance. With safety as a top priority, SPIE specially designed the equipment to withstand a high-pressure hydrogen flow of over 600 m3 per hour from the system to the plant.

,

Key figure

30 MW

capacity for the plant

Key figure

~27 million m3

of hydrogen can be produced annually at the plant