Communauté d’Agglomération de Pau Béarn Pyrénées

CAPBP

REDUCING ENERGY USE AND CO2 EMISSIONS

Fact sheet

  • Services: Tech FM
  • Subsidiary: SPIE France
  • Year: 2023
  • Tags: Energy_Transition, TechFM
  • Status: Completed

The Communauté d’Agglomération de Pau Béarn Pyrénées (CAPBP) is partnering with SPIE Facilities on a public energy performance contract, aiming to cut energy use by more than 20% by 2028.

In 2021, CAPBP announced its sustainable development plan, committing to reducing energy consumption and greenhouse gas emissions from its assets. Its ultimate goal: carbon neutrality by 2040. To this end, SPIE is overhauling systems across a total of 146 CAPBP buildings, with work scheduled for completion by 2028. This includes the use of digital technology to ensure better regulation of energy consumption. SPIE’s experts are renovating heating and ventilation systems and making improvements to equipment rooms. The teams are developing ways to utilise renewable resources, such as geothermal energy, to provide power to some of the buildings. Along with its full range of services, SPIE is targeting a 20% reduction in energy consumption among the ensemble of CAPBP’s buildings.

,

Key figure

20%

reduction in energy consumption by 2028

2040

target date for CAPBP to achieve carbon neutrality

,
“Thanks to this contract… we can meet the challenges of the current energy crisis in the best possible conditions, and we are counting on SPIE Facilities to help us.”
Christian Lesport, Deputy Managing Director — CAPBP AND THE CITY OF PAU