Electrotechnical installations at the Clay School

Fact sheet

  • Services: M&E
  • Subsidiary: SPIE Germany Switzerland Austria
  • Year: 2021
  • Tags: Energy_Efficiency, Energy_Transition

To help the Clay School in Berlin, Germany, achieve a silver quality classification in the Sustainable Building for Federal Buildings rating system, SPIE is supplying and installing a high-voltage system that will power the heating, air-conditioning and sanitary facilities, the fire and intruder alarm system, lifts, data systems and the electrical equipment used during lessons.

SPIE also installed LED lights managed by a smart lighting system that automatically adjusts to daylight conditions and the presence of people, saving the school around 20% on its lighting costs. Once all installations have been completed in 2023, SPIE will also provide maintenance services. This state-of-the-art school infrastructure is intended to serve as a model for future schools in Berlin.

,
2 360

LED bulbs installed by SPIE.

20 %

Savings on lighting energy costs.